Special
metal joint-spacer
Installation can be done with 2 or 3 mm joints or without joints (recommended).
While it is unusual to make joints in the vibrated floor industry we use
metal spacers which are removed after the vibration process with a
special apparatus. After that the joints are filled with the suitable
grout material |
Coved
skirting internal corner, external corner |
Fluid Epoxy
Fluid epoxy is applied filling the gaps under the tiles compressed with
vibration machines. At the end of the work its remainders are deleted.
Due to that fact no cracks and gaps are seen at the joints. If the
correct cleaning is made, no bacteria can survive |